Castle Cary, Wingwall
The wingwall was previously scheduled for soil nail stabilisation as a strengthening solution however, the failure occurred before this solution could be implemented.
The wingwall was previously scheduled for soil nail stabilisation as a strengthening solution however, the failure occurred before this solution could be implemented.
PROJECT: Ground Anchors / Tie Bars
LOCATION: Bruton, Somerset
CLIENT: OnSite Central Ltd
DATE: 2019
ACCIDENT FREE SHIFTS 21
OVERVIEW: Installation of eight, 12m long GB39 tie bars with MS39P pattress plates and four, 13.5m long duplex coated ground anchors through the existing bridge structure.