T455 ND System – Rail Bridge Foundation Work
We deployed the T455 ND system to install permanent heavy-walled casings to a depth of 15 meters, followed by precision drilling of 450mm diameter rock sockets. These piles were engineered to provide robust support for a new rail bridge, ensuring long-term stability and load-bearing capacity.
With the piling works now successfully completed, our team is in the process of demobilising from site, marking the conclusion of another technically demanding and safety-critical phase delivered to the highest standards.
Benefits of Super Jaws Overburden Bits
• No Drive Shoe Needed:
• Outstanding Underreaming:
• Faster Penetration Rates:




